Defined term · Whole Instrument

ESLT method

In Basin Plan 2012 (F2012L02240)

Recorded as in force today

Words as made by Basin Plan 2012 (F2012L02240); later amendments may not be shown. Register data checked to 20 September 2026. See the latest version on the Federal Register.

(1) The indicator sites, and corresponding river reaches and associated floodplains, that are to be used are those used in the development of the Environmentally Sustainable Level of Take (ESLT) method (the ESLT method) for which detailed assessments of environmental water requirements were done.

Definition as made · 23 November 2012 onwards

Definition history

  1. 23 November 2012 onwards

    Definition as made

    Start commencement not settled: dated by registration or assent. Registered 23 November 2012.

    (1) The indicator sites, and corresponding river reaches and associated floodplains, that are to be used are those used in the development of the Environmentally Sustainable Level of Take (ESLT) method (the ESLT method) for which detailed assessments of environmental water requirements were done.

Definition recorded as in force today · Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date