Defined term · Whole Instrument

second load line

In Marine Order 4 (Transitional modifications) 2013 (F2013L00871)

In force today

No amendments recorded to 3 October 2026.

(a) it is engaged on, or is about to engage on, a voyage during which a load line other than the appropriate load line would, at some later time (ambiguous) during the voyage, become the appropriate load line (the second load line); and (b) the second load line would be submerged if the vessel were floating without a list in still salt water of a specific gravity (ambiguous) of 1.025 and the fuel and other material that would normally be consumed or discharged before the second load line became the appropriate load line were unloaded from the vessel.

Definition as made · 1 July 2013 onwards

Definition history

  1. 1 July 2013 onwards

    Definition as made

    Start dated by the commencement provision. Registered 30 May 2013.

    (a) it is engaged on, or is about to engage on, a voyage during which a load line other than the appropriate load line would, at some later time (ambiguous) during the voyage, become the appropriate load line (the second load line); and (b) the second load line would be submerged if the vessel were floating without a list in still salt water of a specific gravity (ambiguous) of 1.025 and the fuel and other material that would normally be consumed or discharged before the second load line became the appropriate load line were unloaded from the vessel.

Definition recorded as in force today · Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date

Only the definitions and amendments held in this collection are shown.