FTP Code
In Marine Order 15 (Construction — fire protection, fire detection and fire extinction) 2014 (F2014L00607)
In force today
As compiled in Compilation No. 2 (F2026C00486), in force from 1 April 2026. Register data checked to 20 September 2026. The Register confirmed it as the latest version on 3 October 2026.
FTP Code means the International Code for Application of Fire Test Procedures adopted by IMO (ambiguous)IMOMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2014-07-01.70 matching works; applicability is unresolved. Resolution MSC.307(88), as in force from time to time.
Definition as made · 1 July 2014 onwards
Definition history
-
1 July 2014 onwards
Start dated by the commencement provision. Registered 26 May 2014.
FTP Code means the International Code for Application of Fire Test Procedures adopted by IMO (ambiguous)IMOMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2014-07-01.70 matching works; applicability is unresolved. Resolution MSC.307(88), as in force from time to time.
Definition recorded as in force today · Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date