Defined term · Whole Instrument
normal value
s 5 of Carbon Credits (Carbon Farming Initiative—Industrial Electricity and Fuel Efficiency) Methodology Determination 2015 (F2015L00346)
Not in force today
Carbon Credits (Carbon Farming Initiative—Industrial Electricity and Fuel Efficiency) Methodology Determination 2015 was repealed on 11 January 2023 by Carbon Credits (Carbon Farming Initiative—Industrial Electricity and Fuel Efficiency—Revocation) Instrument 2022 (F2023L00027), s 5, so no definition in it is in force today.
Definition history
-
27 March 2015 to 11 January 2023, when the law was repealed
Start dated by the commencement provision. Registered 26 March 2015.
9 Meaning of normal value for a site constantsite constantMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.site constant: a parameter is a site constant for an implementation in a measurement time interval if: (a) varying the parameter would change the consumption of: (i) for a measurement time interval in the baseline measurement period for the implementation—baseline relevant energy for the implementation in the measurement time interval; or (ii) for a measurement time interval in an operating measurement period or a …site constant (1) A sitesiteMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.site, of an implementation, means the physical locations of: (a) the implementation equipment for the implementation; and (b) the interactive equipment for the implementation; and (c) the co‑metered equipment for the implementation.site constant for an implementationimplementationMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.implementation means an activity or group of activities of a kind referred to in subsection 11(2) undertaken at a location.implementation is at its normal value in a measurement time interval (ambiguous)time intervalMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27. if: (a) for a baseline emissions modelbaseline emissions modelMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.baseline emissions model, for an implementation, means a baseline emissions model used for the purposes of Part 4.baseline emissions model—the value of the site constant in the measurement time interval is the same as the value in the baseline measurement periodbaseline measurement periodMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.(1) For each implementation, the project proponent must choose a measurement period (a baseline measurement period) for the purposes of developing the baseline emissions model for the implementation.baseline measurement period; or (b) for an operating emissions modeloperating emissions modelMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.operating emissions model, for an implementation, means an operating emissions model used for the purposes of Part 4.operating emissions model—the value of the site constant in the measurement time interval is the same as the value in the operating measurement periodoperating measurement periodMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.(1) For each implementation covered by sub‑method 2, the project proponent must choose a measurement period (an operating measurement period) for the purposes of developing an operating emissions model for the implementation.operating measurement period for the model. (2) For subsection (1)subsection (1)Provision citation; no supported navigation target is published. Cited: subsection (1). Basis: provision not published. Meaning date: 2015-03-27. Passage date: 2015-03-27., the value of the site constant in the measurement time interval is taken to be the same as in the baselinebaselineMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.baseline for an offsets project has a meaning affected by section 107.baseline measurement period (ambiguous)measurement periodMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.7 matching works; applicability is unresolved. if the only variations in the value of the site constant in the measurement time interval are those that have no observable effect on the consumption of baseline relevant energybaseline relevant energyMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.(2) However, if electricity generated at the site of the implementation is consumed by existing implementation equipment, existing interactive equipment or existing co‑metered equipment, only one of the following, as chosen by the project proponent, is baseline relevant energy for the implementation: (a) the electricity generated at the site consumed by the equipment; (b) fuel used to generate that electricity.baseline relevant energy for the implementation in the measurement time interval. (3) For subsection (1)subsection (1)Provision citation; no supported navigation target is published. Cited: subsection (1). Basis: provision not published. Meaning date: 2015-03-27. Passage date: 2015-03-27., the value of the site constant in the measurement time interval is taken to be the same as in the operating measurement period if the only variations in the value of the site constant in the measurement time interval are those that have no observable effect on the consumption of operating relevant energyoperating relevant energyMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-03-27.(2) However, if electricity generated at the site of the implementation is consumed by equipment mentioned in subsection (1), only one of the following, as chosen by the project proponent, is operating relevant energy for the implementation: (a) the electricity generated at the site consumed by the equipment; (b) fuel used to generate that electricity.operating relevant energy for the implementation in the measurement time interval.
Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date before 11 January 2023
Only the definitions and amendments held in this collection are shown.