Defined term · Whole Instrument
EB,i
In Carbon Credits (Carbon Farming Initiative—High Efficiency Commercial Appliances) Methodology Determination 2015 (F2015L01839)
Not in force today
Carbon Credits (Carbon Farming Initiative—High Efficiency Commercial Appliances) Methodology Determination 2015 was repealed on 1 April 2026 by Legislation Act 2003 (C2004A01224), s 50, so no definition in it is in force today.
Definition history
-
26 November 2015 to 1 April 2026, when the law was repealed
Start dated by the commencement provision. Registered 25 November 2015.
EB,i is, for the ith equipment unitequipment unitMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.equipment unit—see section 7.equipment unit, the baselinebaselineMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.baseline for an offsets project has a meaning affected by section 107.baseline energy consumptionenergy consumptionMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.energy consumption is daily total energy consumption, in kWh/day, that is on the GEMS Register for that model.energy consumption, in MWh, that is deemed would have occurred during the reporting periodreporting periodMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.reporting period for an eligible offsets project means a period that is expressed, in an offsets report about the project, to be a reporting period for the project.reporting period had there been no projectprojectMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.project includes a set of activities.project, calculated using: (a) if the equipment unit is a liquid-chilling packageliquid-chilling packageMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.liquid-chilling package has the same meaning as in the Greenhouse and Energy Minimum Standards (Liquid-chilling Packages Using the Vapour Compression Cycle) Determination 2012.liquid-chilling package—equation 4 (ambiguous)equation 4Matching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.; and (b) if the equipment unit is an air conditionerair conditionerMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.air conditioner means an air conditioner or heat pump covered by the Greenhouse and Energy Minimum Standards (Air Conditioners and Heat Pumps) Determination 2013.air conditioner—equation 6 (ambiguous)equation 6Matching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26., and (c) if the equipment unit is a close control air conditionerclose control air conditionerMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2015-11-26.close control air conditioner has the same meaning as in the Greenhouse and Energy Minimum Standards (Close Control Air Conditioners) Determination 2012.close control air conditioner—equation 12.
Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date before 1 April 2026
Only the definitions and amendments held in this collection are shown.