building work
In Code for the Tendering and Performance of Building Work 2016 (F2016L01859)
Not in force today
Code for the Tendering and Performance of Building Work 2016 was repealed on 7 December 2022 by Enabling provision, section 34 of the Building and Construction Industry (Improving Productivity) Act 2016 repealed., so no definition in it is in force today.
Definition history
-
2 December 2016 to 7 December 2022, when the law was repealed
Start commencement not settled: dated by registration or assent. Registered 2 December 2016.
(4) In this code of practice (ambiguous)code of practiceMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2016-12-02.5 matching works; applicability is unresolved., building work has the same meaning as in section 6 of the Actsection 6 of the ActExplicit source reference. Cited: section 6. Linked record: related meaning in 6(5). Basis: unique scope and date. Meaning date: 2016-12-02. Passage date: 2016-12-02.building work, but does not include: (a) work that is described in paragraph 6(1)(e) of the Actparagraph 6(1)(e) of the ActProvision citation; no supported navigation target is published. Cited: paragraph 6(1)(e). Basis: provision not published. Meaning date: 2016-12-02. Passage date: 2016-12-02.; (b) the off-site prefabrication of made-to-order components to form part of any building, structure or works unless that work is performed on an auxiliary or holding site that is separate from the primary construction site (ambiguous)construction siteMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2016-12-02. or sites.
Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date before 7 December 2022
Only the definitions and amendments held in this collection are shown.