Defined term · Whole Instrument
IP
s 4 of Fuel Quality Standards (Paraffinic Diesel) Determination 2025 (F2025L00174)
Recorded as in force today
Words as made by Fuel Quality Standards (Paraffinic Diesel) Determination 2025 (F2025L00174); later amendments may not be shown. Register data checked to 20 September 2026. See the latest version on the Federal Register.
IP followed by a numeric code means the testing method developed under that code by the chartered professional body (ambiguous)professional bodyMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2025-02-25.5 matching works; applicability is unresolved. called the Energy Institute (ambiguous)Energy InstituteMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2025-02-25.2 matching works; applicability is unresolved..
Definition as made · 25 February 2025 onwards
Definition history
-
25 February 2025 onwards
Start dated by the commencement provision. Registered 24 February 2025.
IP followed by a numeric code means the testing method developed under that code by the chartered professional body (ambiguous)professional bodyMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2025-02-25.5 matching works; applicability is unresolved. called the Energy Institute (ambiguous)Energy InstituteMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2025-02-25.2 matching works; applicability is unresolved..
Definition recorded as in force today · Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date
Only the definitions and amendments held in this collection are shown.