Defined term · Whole Instrument
specification
In Commonwealth Procurement Rules 17 November 2025 (F2025L01263)
Recorded as in force today
Words as made by Commonwealth Procurement Rules 17 November 2025 (F2025L01263); later amendments may not be shown. Register data checked to 20 September 2026. See the latest version on the Federal Register.
A specification must not require or refer to a particular trademark or trade name (ambiguous)trade nameMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2025-10-22.7 matching works; applicability is unresolved., patent, copyright, design or type, specific origin, producer, or supplier, unless there is no other sufficiently precise or intelligible way of describing the requirement. In an exceptional circumstance when this type of specification is used, words such as ‘or equivalent’ must be included in the specification.
Definition 2 as made · 22 October 2025 onwards
Definition history
-
22 October 2025 onwards
Start commencement not settled: dated by registration or assent. Registered 22 October 2025.
A specification must not require or refer to a particular trademark or trade name (ambiguous)trade nameMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2025-10-22.7 matching works; applicability is unresolved., patent, copyright, design or type, specific origin, producer, or supplier, unless there is no other sufficiently precise or intelligible way of describing the requirement. In an exceptional circumstance when this type of specification is used, words such as ‘or equivalent’ must be included in the specification.
Definition recorded as in force today · Definition history · or add /at/YYYY-MM-DD to this address for the definition in force on a date
Only the definitions and amendments held in this collection are shown.