Definition · Whole Instrument
solid clearance material
In Australian Radiation Protection and Nuclear Safety Regulations 2018 (F2018L01694) no repeal recorded
Definition by Australian Radiation Protection and Nuclear Safety Amendment (2022 Measures No. 1) Regulations 2022 of the term “solid clearance material” at s 4 · 10 August 2022 onwards
Definition as enacted
Recorded as in force today. Words as made by Australian Radiation Protection and Nuclear Safety Amendment (2022 Measures No. 1) Regulations 2022 (F2022L01050); later amendments may not be shown. Register data checked to 20 September 2026. See the latest version on the Federal Register.
-
(7) Controlled materialcontrolled materialMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10. Passage date: 2022-08-10.controlled material means any natural or artificial material, whether in solid or liquid form, or in the form of a gas or vapour, which emits ionizing radiation spontaneously.controlled material is solid clearance material if: #
-
(a) the material is in solid form; and #
-
(b) the total of the results of dividing the activity concentration of each nuclide of artificial origin in the material by the solid clearance valuesolid clearance valueMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10. Passage date: 2022-08-10.(8) The solid clearance value, for a nuclide in controlled material, is: (a) if the weight of the controlled material exceeds 1 tonne and Table I.2 in Schedule I to GSR Part 3 sets out an activity concentration level for the nuclide—that activity concentration level; or (b) otherwise—the activity concentration level for the nuclide set out in Table I.1 in Schedule I to GSR Part 3.solid clearance value for the nuclide is not greater than one; and #
-
(c) the activity concentration of each nuclide of natural origin in the material is not greater than the level for the nuclide set out in in Table I (ambiguous)Table IMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10. Passage date: 2022-08-10..3 in Schedule ISchedule IProvision citation; no supported navigation target is published. Cited: Schedule I. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: schedule-I. to GSR Part 3Part 3Provision citation; no supported navigation target is published. Cited: Part 3. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: part-3.. #
-
View as a single paragraph
(7) Controlled materialcontrolled materialMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10.controlled material means any natural or artificial material, whether in solid or liquid form, or in the form of a gas or vapour, which emits ionizing radiation spontaneously.controlled material is solid clearance material if: (a) the material is in solid form; and (b) the total of the results of dividing the activity concentration of each nuclide of artificial origin in the material by the solid clearance valuesolid clearance valueMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10.(8) The solid clearance value, for a nuclide in controlled material, is: (a) if the weight of the controlled material exceeds 1 tonne and Table I.2 in Schedule I to GSR Part 3 sets out an activity concentration level for the nuclide—that activity concentration level; or (b) otherwise—the activity concentration level for the nuclide set out in Table I.1 in Schedule I to GSR Part 3.solid clearance value for the nuclide is not greater than one; and (c) the activity concentration of each nuclide of natural origin in the material is not greater than the level for the nuclide set out in in Table I (ambiguous)Table IMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10..3 in Schedule ISchedule IProvision citation; no supported navigation target is published. Cited: Schedule I. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: schedule-I. to GSR Part 3Part 3Provision citation; no supported navigation target is published. Cited: Part 3. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: part-3..
solid defined in this legislation · dashed defined in the enabling Act · dotted matching terms in other legislation. Hover, focus or use the context button to read source details.
Original source wording
solid clearance material: see subsection 65(7)subsection 65(7)Provision citation; no supported navigation target is published. Cited: subsection 65(7). Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10..
Other source passages
(7) Controlled material is solid clearance material if:
(a) the material is in solid form; and
(b) the total of the results of dividing the activity concentration of each nuclide of artificial origin in the material by the solid clearance value for the nuclide is not greater than one; and
(c) the activity concentration of each nuclide of natural origin in the material is not greater than the level for the nuclide set out in in Table I.3 in Schedule ISchedule IProvision citation; no supported navigation target is published. Cited: Schedule I. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: schedule-I. to GSR Part 3Part 3Provision citation; no supported navigation target is published. Cited: Part 3. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: part-3..
Surrounding provisions
- before(ii) the package is damaged in such a way that safety provisions are degraded.
- definitionsolid clearance material: see subsection 65(7)subsection 65(7)Provision citation; no supported navigation target is published. Cited: subsection 65(7). Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10..
- aftersolid clearance value: see subsection 65(8)subsection 65(8)Provision citation; no supported navigation target is published. Cited: subsection 65(8). Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10..
- 6 At the end of section 5
An extract of the provisions surrounding this definition. Source: Australian Radiation Protection and Nuclear Safety Amendment (2022 Measures No. 1) Regulations 2022 as made. Legislative text is from the Federal Register of Legislation, licensed under CC BY 4.0.
- beforeSolid clearance material
- definition(7) Controlled material is solid clearance material if:
- (a) the material is in solid form; and
- (b) the total of the results of dividing the activity concentration of each nuclide of artificial origin in the material by the solid clearance value for the nuclide is not greater than one; and
- (c) the activity concentration of each nuclide of natural origin in the material is not greater than the level for the nuclide set out in in Table I.3 in Schedule ISchedule IProvision citation; no supported navigation target is published. Cited: Schedule I. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: schedule-I. to GSR Part 3Part 3Provision citation; no supported navigation target is published. Cited: Part 3. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: part-3..
- after(8) The solid clearance value, for a nuclide in controlled material, is:
- (a) if the weight of the controlled material exceeds 1 tonne and Table I.2 in Schedule ISchedule IProvision citation; no supported navigation target is published. Cited: Schedule I. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: schedule-I. to GSR Part 3Part 3Provision citation; no supported navigation target is published. Cited: Part 3. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: part-3. sets out an activity concentration level for the nuclide—that activity concentration level; or
An extract of the provisions surrounding this definition. Source: Australian Radiation Protection and Nuclear Safety Amendment (2022 Measures No. 1) Regulations 2022 as made. Legislative text is from the Federal Register of Legislation, licensed under CC BY 4.0.
Definition history of the term
-
10 August 2022 onwards
This definition · Definition by Australian Radiation Protection and Nuclear Safety Amendment (2022 Measures No. 1) Regulations 2022 (F2022L01050)
Start dated by the commencement provision. Registered 9 August 2022.
(7) Controlled materialcontrolled materialMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10.controlled material means any natural or artificial material, whether in solid or liquid form, or in the form of a gas or vapour, which emits ionizing radiation spontaneously.controlled material is solid clearance material if: (a) the material is in solid form; and (b) the total of the results of dividing the activity concentration of each nuclide of artificial origin in the material by the solid clearance valuesolid clearance valueMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10.(8) The solid clearance value, for a nuclide in controlled material, is: (a) if the weight of the controlled material exceeds 1 tonne and Table I.2 in Schedule I to GSR Part 3 sets out an activity concentration level for the nuclide—that activity concentration level; or (b) otherwise—the activity concentration level for the nuclide set out in Table I.1 in Schedule I to GSR Part 3.solid clearance value for the nuclide is not greater than one; and (c) the activity concentration of each nuclide of natural origin in the material is not greater than the level for the nuclide set out in in Table I (ambiguous)Table IMatching term; applicability to this passage has not been established. Basis: label match suggestion. Meaning date: 2022-08-10..3 in Schedule ISchedule IProvision citation; no supported navigation target is published. Cited: Schedule I. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: schedule-I. to GSR Part 3Part 3Provision citation; no supported navigation target is published. Cited: Part 3. Basis: provision not published. Meaning date: 2022-08-10. Passage date: 2022-08-10. Scope: part-3..
The term · Definition recorded as in force today · Definition history · or add /at/YYYY-MM-DD to the term's address for another date
This address always names this definition. Only the definitions and amendments held in this collection are shown.